Projects

Our proven track record also demonstrates our long-standing commitment to providing our clients with high-quality services.

2020 – 2021

  • Pengerang Cogeneration Plant Shutdown Unit 11, 12, 21, 22 (2020)
  • Jacketed Piping Project & LP Steam at SRU Area (2021)
  • Repair Insulation Mattress for Gas Turbine at Pengerang Cogeneration Plant (2021)

August 2016 – August 2019

  • Master Service Agreement (MSA) for Insulation Services with PETRONAS.
    Covered: Onshore (Kerteh, Melaka, Gebeng & Gurun)

March 2016

  • Refractory work at Petronas Chemical Olefin Sdn Bhd. Repaired and replaced the damaged wall brick, refractory, ceramic module inside fire box F1302 (F#2).

February 2016

  • Refractory work at Petronas Chemical Ethylene Sdn Bhd. Repaired ceramic fiber and MTB installation at F#2.

2012 – 2015

  • Refractory work at Petronas Chemical Olefin Sdn Bhd. Repaired the wall brick and refractory at F1301.
  • Insulation work at Petronas Chemical MTBE Sdn Bhd (term contract).
  • Insulation work at Petronas Chemical Ethylene Sdn Bhd for mini shutdown.
  • PSR-1 Rejuvenation for furnace Package A at Petronas Penapisan (M) Sdn Bhd.

2018 – 2011

  • Insulation work at MSET Engineering Corporation Sdn Bhd.
  • Refractory work at Petronas Chemical Olefin Sdn Bhd. Repair wall brick and refractory work at firebox furnace.
  • F1305 routine shutdown at Optimal Chemicals (M) Sdn Bhd.
  • Supplying Insulation Material at Petronas Vinyl Chloride (M) Sdn Bhd.
  • Insulation work at MTBE Gebeng. Repaired Incinerator U-1403 H (Ramming type).
  • Term contract for Insulation services at PETLIN (M) Sdn Bhd.
  • Sub-contractor to HSE Resources Sdn Bhd for Fire Proofing F-901 BD Butadine Fendolite TG.

1992 – 2003

  • Supply manpower and materials, fabricate and install insulation materials at DULANG ‘B’ with Petronas Carigali Sdn Bhd.
  • Installed and repaired insulation for hot, cold and noise suppression applications as per Esso Production (M) Inc (EPMI)’s.specification on EPMI’s onshore and offshore facilities (Semangkok Alfa, Tiong Alfa & Bravo, Bekok Alfa, Bravo & Charlie). Job awarded by EPMI.
  • Total Insulation for Guntong Alfa platform at MISC Johor (PETRONAS & EPMI)
  • Insulation and refractory works at YTL Pahang Cement Sdn Bhd while the plant was under construction. 330 metric ton refractory work and 2750 m2 insulation work.
  • Insulation and refractory works at Negeri Sembilan Cement Industries Sdn Bhd while the plant was under construction. 187 metric ton refractory work and 1055 m2 insulation works.
  • Insulation and refractory works at YTL Power Plant Station, Paka.
  • Insulation and refractory works at Stesen Janaelektrik Sultan Salahudin Abdul Aziz, Klang.
  • Insulation and refractory works at Milo Chembong Factory during the plant’s construction work.
  • Insulation and refractory works at PERWAJA Holdings Berhad, Kemaman.
  • Sub-contractor to Newwin Engineering (M) Sdn Bhd. Insulation work for ‘tie-in’ for the removal unit in GPP4 (removal and reinstall).
[bold_timeline_item_button title=”Expand” style=”” shape=”” color=”” size=”inline” url=”#” el_class=”bold_timeline_group_button”]